Fincon has been working with tilt-ups since they were a cutting edge technology in the 80s. Tilt-up was designed as a method to make high-quality, high-integrity buildings – at a faster pace than traditional methods. The process of Tilt-up construction follows the listed steps:
Prepare building site
Form and pour footings and foundation
Form and pour building floor
Form concrete panels on top of floor
Apply Bond Breaker formula to prevent concrete from sticking to concrete
Pour concrete panels with high strength concrete
Lift dried concrete panels into place with crane (Building Erection)