Orem Technology Center Phase 3 consists of two buildings; Building Six and Building Seven. Building Six is a 136,100 square foot tilt-up building and Building Seven is a 89,423 square foot tilt-up. The total square footage is 227,000 square feet. Fincon is overseeing the work on the building shells and is also the concrete and tilt-up contractor on the project. Orem Tech is located on 1200 North and Geneva Road in Orem, UT.