Orem Tech Building 7 -Orem, UT Tilt-Up Panels Poured
Orem Technology Campus is located just South the 1600 N Exit West of I-15. Fincon has worked on all the buildings in the campus and the latest is the slab for building 7 which is pictured here. This shows the control joints cut in the slab. This is a concrete tilt-up building.