• Portfolio
    • Concrete Tilt-Up Buildings
      • Boswell Wasatch*
      • Tamarak / DMV Building*
      • Sunpro Tennis and Pickleball Club
      • The Home Depot – Provo
      • Spring Haven Business Park
      • SpringPointe
      • Orem Tech Center 1-4
      • Supranaturals
      • Curecrete Chemical
      • Robertson Electric
    • Interiors
      • Boswell Wasatch Interiors
    • Parking Structures
      • Parking at Citifront
  • News
  • About Us
  • Subcontractors
  • Contact
  • Login

Search

FINCON INC

The Area Leader in Tilt-Up Technology

Find Us

Address
241 South Vineyard Road
Orem, UT 84059

Hours
Monday–Friday: 9:00AM–5:00PM

Skip to content
Fincon
  • Portfolio
    • Concrete Tilt-Up Buildings
      • Boswell Wasatch*
      • Tamarak / DMV Building*
      • Sunpro Tennis and Pickleball Club
      • The Home Depot – Provo
      • Spring Haven Business Park
      • SpringPointe
      • Orem Tech Center 1-4
      • Supranaturals
      • Curecrete Chemical
      • Robertson Electric
    • Interiors
      • Boswell Wasatch Interiors
    • Parking Structures
      • Parking at Citifront
  • News
  • About Us
  • Subcontractors
  • Contact
  • Login

Tag: joists

Bryte Building Tilt Panel Steel Erected

by adminBrytePosted on October 6, 2022October 6, 2022No Comments

Fincon just coordinated with the structural steel sub in the erection of the structural steel. The building is a 40,000 SF concrete tilt-up building and the panels are 45,000 SF. 

Find Us

Address
241 South Vineyard Road
Orem, Utah 84059

Hours
Monday–Friday: 9:00AM–5:00PM

FINCON INC.

The Area Leader in Tilt-Up Technology

Search

Fincon inc. All Rights Reserved. © 2013 - 2023